Project Basics: PT PIP’s nickel mine (Sulawesi Tenggara), 261 Ha, IUP valid till 2031, mixes APL (95 Ha) and HPT (166 Ha).
Resources: 11.01 million wmt (Ni ≥1.30%), split into Indicated (1.12M wmt) and Inferred (9.89M wmt).
Reserves: 1.01 million wmt Probable Reserves (1.54% Ni), via open-pit mining (90% recovery, 3% dilution).
Mining Plan: 4-year life (2024-2027), 0.35M wmt/year output, Lerch-Grossman pit design.
Economics: NPV $7.86M, IRR 257.78%, payback 0.37 years; $35.22/wmt ore price, $12/ton op cost.
Key Recommendations: Infill drilling (25m spacing), regular topo updates, IPPKH expansion for HPT areas.